| Kitchen, bath, or occupied remodel | Is material detached, which rooms/floors are involved, and what finished surfaces or shared areas need protection? | Separate reusable items and suspect material; show the full carry path. | Scope photos, permit status, before/after condition, and disposal receipt. |
|---|
| Concrete, paver, block, or tile removal | How dense is the assembly, how large are the pieces, and is loading equipment available? | Keep clean masonry apart from mixed C&D, soil, trash, and unknown coatings. | Dimensions, load photos, scale/gate ticket, and receiving facility. |
|---|
| Roofing tear-off | Roof type, squares, layers, moisture, decking, and whether the site is a regulated facility? | Separate metal and packaging where practical; contain sharp material. | Material/layer photos, permit, inspection documents as applicable, and tickets. |
|---|
| Selective or structural demolition | What remains attached, which utilities are cleared, and do asbestos, historic, flood, or structural reviews apply? | Do not combine demolition authorization with a haul-off quote. | Permit and survey/notification records, load records, and closeout proof. |
|---|
| Contractor phase cleanup | Who triggers pickup, where is the pile, what can be mixed, and what does the next trade need cleared? | Use a marked staging area with a written exception list. | Ticket number, photos, weights/receipts, PO or invoice code, and completion time. |
|---|
| Storm repair debris | Which jurisdiction and event guidance apply, and is this damage debris or new repair debris? | Keep vegetative, C&D, appliances/electronics, chemicals, and concrete separate. | Damage photos, permit, contractor credentials, receipts, and insurer/FEMA records as applicable. |
|---|